|
Aug 2007 |
3669 | |
|
|
(Click on any photo for a full-size version) | |
| The ongoing lining out of the coach continues with some 260 metres in total to be completed. |
| |
|
|
The lining consists of both vertical and horizontal runs as well as 40 double ended arrowed vertical lines. | |
| Preparing for the next major reconstruction work, a full set of seats have been acquired. |
|
|
|
|
While most of the compartment doors are ready, work continues on the 8 goods doors. | |
|
|
The remaining fixed quarter light windows go in and the preparation for the scumbling on the guard's ducet continues. |
|
|
This document maintained by
Ross.stewart@rss43.fsnet.co.uk. Material Copyright © 2007 Ross Stewart | ||