|
Feb 2007 |
3669 | |
|
|
(Click on any photo for a full-size version) | |
| After almost 4 years of dust and grime, the lower section of the roof gets a quick brush over prior to the prep work for the re-instatement of the cornice that cover the edge of the roof canvas. The white bit is the clean bit! |
![]() | |
![]() |
Each length of cornice (approx 20ft ) had to have pilot hoes every six inches drilled and sunk in preparation for the screws and the plugs. Every 6 inches over the lengths for both sides... and I volunteered for this!! | |
| As each section of cornice went up, the side looked more complete. |
![]() |
|
| Lots of looking, screwing, fitting etc... |
|
|
![]() |
... until hey presto as if by magic both side finished, apart from the plugs, cutting. sanding etc. | |
|
This document maintained by
Ross.stewart@rss43.fsnet.co.uk. Material Copyright © 2007 Ross Stewart | ||