| 3669 | ||
|
|
(Click on any photo for a full-size version) | |
| Before the body was lowered back on to the frame the rotten floor was replaced. This was easier to do with the body jacked up. These pictures show the final result. |
![]() | |
![]() |
To allow work to more easily continue on the knee irons, the body remained jacked up. These two views of side 'A' show the extent of the preparation required before the external panels can make an appearance. | |
| These three views show the current state of the van end frames and doors. Some repair work has already taken place to the door frames but there is much still to go. |
![]()
![]() | |
|
This document maintained by
Ross.stewart@rss43.fsnet.co.uk. Material Copyright © 2006 Ross Stewart | ||