Sept 2007

3669
Back  (Click on any photo for a full-size version)  
  Real progress in the attempt to get the side facing the field  (ie corridor side) fully watertight.  The 1st set of luggage doors go back.
  The match boarding on the corridor goes back.
  The lining on the corridor side is complete and by the looks of it Roy's had enough lining.
This document maintained by Ross.stewart@rss43.fsnet.co.uk.
Material Copyright © 2007 Ross Stewart